2021 Hatteras 59' (17.98 m) GT59 Convertible
Stuart, Florida, United States
Change Order
This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines. The engines are still under warranty until 12/7/2025 or 2000 hours.
- Convertible Boats
- Power
- Used
- Diesel
- Fiberglass Hull
- Stock #: MM
Description
This 2021 HATTERAS 59’ GT59 CONVERTIBLE “Change Order” is a 3 stateroom 2 head layout with 600hrs on reliable CAT C32A engines. The engines are still under warranty and warranty can be extended out further. All service is up to date on engines and generators with records. The 2021 59’ HATTERAS CONVERTIBLE is loaded with options and is in very nice condition. Call to inquire for more information or schedule a showing on "Change Order" the 2021 HATTERAS 59’ CONVERTIBLE GT59.
HIGHLIGHTS
- CAT C32A engines with warranty until 12/7/2025 or 2000 hours.
- 2022 Garmin electronics package
- 4/2022 Electrosea system added
- 4/2022 KVH tracvision 7 HD tv added
- 4/2022 JL Audio system with speakers, subwoofer, and amplifiers added
- Two generators
- Mezzanine seating in cockpit
- Air conditioned flybridge
- Bow thruster
- Water maker
- Ice chipper
- Underwater lights
- Sirius/XM weather & radio
Coral Gables Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by HMY Yacht Sales, Inc.. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel
Specifications
Stock #: MM
LOA: 59' (17.98 Meters)
Type: Power- Used
Year: 2021
Beam: 18' 9''
Draft Max: 4' 9''
Cabins: 3
Heads: 2
Fuel Type: Diesel
Hull Material: Fiberglass
Fuel Tank: 1750 Gallons (6624.47 Liters)
Fresh Water: 200 Gallons (757.08 Liters)
Holding Tank: 120 Gallons (454.25 Liters)
Displacement: 89000 lbs
Photos click to view all
Engines
Engine 1
- Engine Make: Caterpillar
- Engine Model: C-32A
- Power HP: 1600.00
- Power KW: 1193.12
- Fuel Type: Diesel
- Hours: 600.00
Engine 2
- Engine Make: Caterpillar
- Engine Model: C-32A
- Power HP: 1600.00
- Power KW: 1193.12
- Fuel Type: Diesel
- Hours: 600.00
Full Details
Vessel Details
Salon:
- Satin teak woodwork throughout
- L-shaped sofa with storage underneath and pull out double berth
- Custom salon cocktail table with storage inside
- Carpeting with carpet runner
- Amtico threshold at entrance of salon door
- Samsung 40” flatscreen tv to starboard with electric lift
- Satellite tv
- Denon AV receiver
- Samsung blu ray player
- Surround sound speakers
- Sliding salon door
- 110V outlets
- Cabinet storage
- AC distribution panel
- Overhead lighting
- Rope accent lighting
Galley/Dinette:
- Amtico flooring in galley
- Peninsula galley layout with optional dinette
- Corian countertop with drop in sink with single lever faucet
- Garbage disposal
- 2 refrigeration under counter units (4 drawers total)
- Miele 4-burner cooktop
- U-line ice maker
- Storage drawers & cabinets
- Bottle storage to port
- Overhead & Rope lighting
- Microwave/convection oven covered by cabinet door
Companionway:
- Carpeting with carpet runners
- Overhead lighting
- Access to port and starboard attic storage, electric panels with lighting
- Access hatches to all bilges
- NEW 2022 Haier Washer/dryer
Master Stateroom
- Queen sized walkaround bed with storage underneath
- Carpeting
- Cedar lined hanging closet
- Nightstands with drawers
- 2 reading lamps
- Overhead lighting
- Rope lighting
- Cabinet & drawer storage
- 110V outlets
- Samsung flatscreen tv & soundbar
- Ensuite head
Master stateroom head
- Separate shower stall
- Corian countertop
- Sink with faucet and storage underneath
- Headhunter electric head
- Towel racks
- Mirror vanity with storage
- 110v outlet
- Overhead lighting
- Amtico flooring
VIP Stateroom:
- Queen sized island berth with storage underneath
- Large drawer under bed
- Cedar lined hanging locker
- Overhead lockers to port & starboard
- Flip up storage to port & starboard
- Flatscreen tv
- Overhead lighting
- Carpeting
- Overhead hatch with screen & privacy cover
- 110v outlets
- Ensuite head
VIP/Day head
- Separate shower stall
- Corian countertop
- Sink with faucet and storage underneath
- Headhunter electric head
- Towel racks
- Mirror vanity with storage
- 110v outlet
- Overhead lighting
- Amtico flooring
Starboard Bunk Stateroom
- Over/Under bed with storage under lower berth
- Carpeting
- Nightstands with storage
- Reading lamps
- Cedar lined hanging locker
- Overhead lighting
- Flatscreen tv
- 110v outlets
Tackle room
- Corian countertop
- Rod/tackle storage
- Cabinet storage
- Overhead lighting
- Amtico flooring
Flybridge
- Center island helm
- Large lounge forward of console with large freezer underneath
- Bench sea to port & starboard with storage underneath
- Air conditioning for flybridge
- Storage port & starboard forward in cabinet
- 4 cupholders forward
- 3-sided enclosure
- 5 rod rocket launcher on aft railing
- Teak helm & companion seats with footrests
- Aft LED spreader lights
- Rupp triple spreader outriggers
- Soundsystem with 6 JL Audio speakers
- Zipwake trim tab control
- Optimus steering display
- ACR spotlight control
- CAT active station display
- Fuel gauges
- Side power bow thruster
- Single lever control with thruster buttons
- Teak helm pod
Electronics:
- 2 Garmin 8617 GPSMap 17” touch screen displays
- Garmin 7” touchscreen display with C-zone system
- Garmin open array radar
- Garmin autopilot
- Icom M506 vhf radio
- 2 CAT engine displays
- Hatteras systems display
- AM/FM/SiriusXM/Bluetooth system through Garmin unit
- Satellite tv
Cockpit:
- 6 rod/ 2 cupholder/ drawer teak battle saddle
- Custom oval table that fits on battle saddle
- Mezzanine Seating with cushions
- Large freezer in mezzanine seating
- Storage in mezzanine step
- Refrigerated drink box in cockpit step by salon door
- Storage in mezzanine step to starboard
- 6 gaff holder/chamois holders under gunnel
- Saltwater/freshwater washdown
- 50 amp shorepower cord on cablemaster
- Fishbox to port with ice chipper dump
- Fishbox to starboard
- Large lazzarette, seakeeper ready
- Teak covering boards
- 6 in-gunnel rodholders
- 6 Haunch clearing rodholders
- Transom door with lift gate
- Transom Live Well with window and lights
- Eskimo Ice Machine in lazzarette
- Electric Grill in Top of Mezzanine Tackle Center
- Salon sliding door
- JL Audio speakers
- Lumitec underwater lights
Engine Room:
- Twin Caterpillar C-32A 1600HP with 600hrs
- Engine warranty until 12/7/2025 or 2,000hrs
- 2 Cummins Onan Generators 21.5KW (Port 660 hours & Starboard 630 hours)
- Electrosea system
- 2 Mach5 freshwater pumps
- Watermakers Inc watermaker
- Oil change system
- Eskimo Ice Machine
- LED Engine Room Lights
- SeaFire Fire Extinguishing System for Engine Room
- 24V DC Bilge and Sump Pumps
- Auxiliary Emergency Bilge Pump, 150GPM in Lazarette
- 20-Gallon Electric Water Heater
- Racor Fuel Filter/ Water Separator for both Engines, and Generators
- Engine Start/ Stop Switches and Hour Meter
- Automatic Battery Charger
Foredeck
- Maxwell windlass with foot control
- Anchor with chain & rope
- Anchor locker with washdown
Mechanical Disclaimer
Engine and generator hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.
Disclaimer
The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.
Listing MLS by Yachtr.com
Contact Us

430 W 23rd Street
Holland MI 49423
Office: 1-616-622-4886
Email: brokers@cgyacht.com
Coral Gables Yachts is an independent yacht brokerage located in Holland, Michigan. We pride ourselves on knowledgable and forthright representation of every yacht we discuss. We list boats locally and sell internationally with an excellent track record of repeat business from our clients.